Construction of the approved three-story, mixed-use building with 105 residential units is on hold. The bowling lanes and equipment were removed in December.
The 21,000 SF gutted space is available for short term lease.
Construction of the approved three-story, mixed-use building with 105 residential units is on hold. The bowling lanes and equipment were removed in December.
The 21,000 SF gutted space is available for short term lease.
No posts